Project Management

Pre-Construction Management

From the moment we take up a project, we chalk out a roadmap for our customers, taking ownership of the entire project, right from its budding stages. This process includes advising, monitoring and reporting on Pre-Construction activities of the project. Masters initiates the project by preparing a project execution plan that will set out the cost, time and quality objectives of the project, and the systems and procedures that will be used to achieve these objectives. The overall objective of the Pre-Construction process is to improve efficiency, reduce cost and time (by providing clear briefings, pre-planning meetings, workshops and resource allocation) and value maximization 

Step 1 : Soil Test

A soil test can determine fertility, or the expected growth potential of the soil which indicates nutrient deficiencies, potential toxicities from excessive fertility and inhibitions from the presence of non-essential trace minerals. The test is used to mimic the function of roots to assimilate minerals.

Construction Management

Construction management tasks include constructability and cost-saving reviews, consequent design changes and environmental compliance. The construction phase involves implementation of the construction plan by the Project Construction Manager including day-to-day communications and coordination with contractors.Planning management/Forecasting ManagementCost management

Step 2 : building Foundation and column Excavation

A foundation is a lower portion of building structure that transfers its gravity loads to the earth. Foundations are generally broken into two categories: shallow foundations and deep foundations. A tall building must have a strong foundation if it is to stand for a long time. A skyscraper deep foundation.

Planning management

Arranging, planning is a significant piece of the development the executives. Arranging and booking of development exercises assists engineers with finishing the task in time and affordable. The term ‘Development’ doesn’t just indicates proactive tasks including men, materials and hardware yet in addition covers the whole range of exercises from origination to acknowledgment of a development project. In this way, the executives of assets, for example, men, materials, hardware requires compelling preparation and planning of every movement.

Our Client & Partners

step 3 : Roof Shuttering and
Concrete Work

Concrete work includes the following basic processes: preparation of the concrete mix; delivery of the mix to the construction site; feeding, distribution, and compaction of the mix in the formwork (molds); the curing of the concrete while it is hardening; and quality control of the concrete work.

Cost management

Development Cost administration alludes to the exercises concerning arranging and controlling a task’s spending plan. Viable undertaking cost administration guarantees that a task is finished on financial plan and as indicated by its arranged degree. Since you survey the progress of a venture to some extent to some extent by its expense execution, cost administration is an excellent determinant of the undertaking result.

Cost administration exercises are directed all through the task life cycle, from arranging and financial plan designation to controlling expenses during project execution and surveying a venture’s expense execution upon fruition.

Step 4: Flooring, Electrical, Plumbing, Windows, Door, Gate Woork

Electricians install and maintain electrical systems in both indoor and outdoor settings. Plumbers move materials, liquids, and gasses in and out of buildings and areas by using pipes, drains, and fixtures. Plumbing fixtures are exchangeable devices that deliver and drain water from a plumbing system

Hire the best house
construction service

250+

Homes

250+

Checks

100%

Transaction

Testimonial Videos

Explore how our work has changed the life of our customers.

©2022. Space Designers. All Rights Reserved.